Modify the Delivery Date 修改交貨日期
Dialog
A third bargaining chip is modifying the delivery date to allow more time for the manufacturer to produce the required units.
第三個(gè)可以用來(lái)議價(jià)的籌碼是修改交貨日期,這給制造商更充裕的時(shí)間來(lái)制造你所訂的數(shù)量.
Mel:And that's the bottom line.Not too bad ,even if I do say so myself.
這是最低價(jià)格了,我自己看都覺(jué)得很不錯(cuò)了.
Bill:Well,to be honest,I was figuring on something about 10% lower.
老實(shí)說(shuō),我還希望能再打9折.
Mel:That's about what I'd normally charge,but you added these time restrictions and I'm going to have to pay some overtime to get it in under the wire.
其實(shí)我平常就是那個(gè)價(jià)碼,但因?yàn)槟阌袝r(shí)間限制,我得請(qǐng)工人加班,才能準(zhǔn)時(shí)交貨.
Bill:So how much time do you need to lower the price?
時(shí)間要往后延多久,我才能有折扣?
Mel:Usually there isn't any time requirement.
我通常都不壓時(shí)間限制的.
Bill:I know that,but I'm not going to do that.I want this finished quickly with no breaks in between,so the time limit stays.
我知道,但我不想這樣.我希望這批貨盡快完成,完全沒(méi)有延誤,所以時(shí)間限制不能變.
Mel:I won't do that to you.
我不會(huì)害你開(kāi)天窗的.
Bill:Right,not with this penalty in the contract.
沒(méi)錯(cuò),因?yàn)檫@次遲交會(huì)有罰款.
Mel:Okay.Give me fifteen working days from start to finish and I'll lower the price 10%.
好吧.開(kāi)工后,給我15個(gè)工作日,我就再降個(gè)百分之十.
Bill:How about ten days?
10天如何?
Mel:I need 12 or no deal.
我要12天,否則免談.
Bill:Done!
成交.